A worked example
A fictional outdoor retailer proposes a guide to repairing a rain jacket. The editor accepts practical tutorials but not product-list articles. A brief that merely says 'one guest post' leaves a preventable mismatch. An outline, audience statement, proposed resource link and disclosure question give the editor enough context to evaluate the actual article.
A practical checklist
- Describe the target reader, proposed title and three points the article must cover. Add the evidence and images you can supply, including permission status.
- Document manuscript ownership, revision rounds and final approval. Ask whether a publication can change the link destination or wording during its edit.
- Confirm the complete quote, link attributes and actual delivery terms. Keep cancellation, replacement and removal questions open until the provider supplies approved terms.
Turn an inquiry into a brief an editor can approve
Start with the exact publication and section, proposed article title, reader and intended outcome. Add the destination URL and proposed anchor in context. Specify who supplies the manuscript, images, supporting evidence and author details. If you need writing, state the expected scope rather than assuming it is part of placement. Ask the editor to acknowledge these points in writing with the quote. A response that only says the domain and price leaves enough ambiguity to cause a costly rewrite later. Keep the inquiry and accepted scope together so the handoff does not rely on someone remembering a phone call.
Define what happens when the article needs changes
Agree who reviews the first manuscript, who can approve changes and which revisions are covered. Distinguish correcting a factual error from replacing the entire topic after writing has begun. Ask whether substantial changes require a revised quote. Discuss what happens if the editor declines the final article or cannot meet the requested schedule, and check the applicable refund terms before committing. Avoid inventing a standard turnaround for all publications. A supplied estimate is useful, but the timing for your brief depends on acceptance, production and review. Record the agreed sequence rather than only a desired live date.
Send a confirmation request with answerable fields
Use questions that let the editor confirm or amend specific points. Leave room for an explicit response where your assumption may be wrong. After agreement, save a dated copy and give the writer the accepted version. If the publication changes, revisit the whole brief because audience, format and link policy can change with it.
Please confirm: [publication / section], [article angle], [writing responsibility], [placement and production charges], [included revisions], [paid disclosure and link attributes], [approval steps], [target timing], [decline / cancellation terms].Identify who has authority to approve the final version
A buyer, writer, subject specialist, intermediary and editor can all be involved, but their responsibilities differ. Name who approves factual claims, who accepts commercial changes and who gives final editorial approval. Decide how conflicting comments will be resolved before the writer receives them. Give the production team one current brief and mark older versions as superseded. If approval arrives through a phone call, summarize the accepted points in writing and ask the relevant person to confirm them. This creates a usable record without pretending that an informal exchange answered questions nobody actually discussed. A clear approver also makes later correction requests easier to route.
Keep requested timing separate from agreed timing
Explain when you would like the article published and ask the editor which production steps must happen first. Record any confirmed schedule with its dependencies, such as receipt of source material or completion of a review. Do not infer a guaranteed publication date from a generic catalogue turnaround. If your campaign has a fixed event date, discuss that constraint before accepting the quote. Decide what happens if the article cannot be approved in time and preserve the applicable commercial terms. When a scope change delays the process, update the schedule and inform the person responsible for the campaign rather than leaving the original date in the brief.
What to avoid
Do not fill unanswered commercial fields with assumptions. A planning document is not a contract or a payment receipt. Use the placement inquiry to confirm the price, scope and delivery commitments by email.


